Day 56 - Drainage Pipe Intallation
The view is of a deck drain after the deck has been sealed. It allows for water to flow into the drain and off of the bridge.
A view of another deck drain.
The wall after slip forming. The reflective tabs were installed according to spec.
The crew works on installing a drainage pipe near 1+00 on the west side of the project.
After the collar was placed and the pipe was aligned the placed clean rock on the sides of the pipe according to spec and back filled with dirt.
The excavator operator works on back filling around the pipe.
After the dirt was filled in a sheeps foot roller was used to compact it even more. It was then rolled with a dozer and excavator multiple times to ensure it was compacted. The dirt and grading superintendent will cut the entrance to the correct grade and place gravel. This is a temporary stopping point so the home owner has access to his field.