Day 91 - Guardrail
The crew sat all the posts on the SW corner of the bridge first.
A picture of the post hammer crew driving a post on the NW side of the bridge.
Crew works to install the rail.
Another view of the crew working on driving the posts on the NE corner of the bridge.
Road rock rutted out in one area as seen in the picture.
After the rail had been installed but not tightened.
Current progress on the NE corner of the bridge.
NE end stop was installed. Diagonal lines are facing the correct way.
SE end stop was installed. Diagonal lines are facing the correct way.
NW end stop was installed. Diagonal lines are facing the correct way.
SW end stop was installed. Diagonal lines are facing the correct way.
Comments
Post a Comment