Day 78 - Rirap
Operator works to install Type II rock blanket along the SW corner of the bridge.
The drainage pipe was cut to grade and rolled at the field entrance located near 1+00.
The ditch and slope were compacted on the SW corner of the job.
Another angle of the slopes.
Shows the clearance between the CMP and the light pole.
Contractor originally installed an outdated dileaneator. An updated version made out of aluminium replaced the flimsy plastic.
The new dileaneator compared to the plastic one.
Another angle.
Straw ditch checks were installed according to modot standards.
Operator works on placing rip rap on the SE side of the bridge.
Another angle looking south of the SW corner of the project.
The temporary crossing prior to being removed.
A shot of the field entrance.