Day 3 - Bridge Demo Clean Up


Current progress of the bridge looking West.


Picture of the east abutment.

Stream has a lot of dirt and rock build up that will need to be removed.

This shows the eastern abutment wing-wall.

The water flowing through the site is clean and is not carrying any soil particles.

A tree that will need to be removed during clearing and grubbing.

Crew threading a cable through to secure the hook to the crane.

The cranes counterweight that weighs approximately 34,900 lbs.

The crane operator keeps the counterweight at 84 degrees while moving the block so he doesn't tip the crane.

The operator sets the block down, moves away and then tips the crane to allow the crew to spread the tracks out using an excavator.

Once the crane is assembled the crew pulls fence posts where the rock blanket will be installed.

The crew then finishes removing steel and wood from the creek that the excavator couldn't reach.

The operator has to carefully swing each piece of debris to a pile and neatly stack it for easy removal later on.