Day 10 - Work Pads
The crew attached the concrete bucket to the crane to easily transport the concrete to the other side of the bridge.
The general layout of the stream in it's current state. Contractor is working towards installing erosion control.
The form work is placed around the piles.
The laborer and foreman work on pouring the concrete into the work pad forms. The concrete is optional and paid for at the contractors expense and does not require testing.
The concrete after it was finished. The steel reinforcement will and chairs will be placed on this work pad to give a nice surface to work with that is both level and clean.
This shows the work pad from roadway elevation.